The Director of Public Works has agreed, so far as the line shown in red upon the enclosed diagram No T2698 is concerned, to the laying of the form of permanent way construction marked "A" upon the enclosed drawing No T2699, which is the form of construction submitted by us on the 31st May 1902.
This does not provide for the extra foundation concrete which Messrs Leigh & Orange at the instigation of the Director of Public Works added to the plan in December 1902.
In the case of double line with side poles the Company is carrying out the requirements of the Director of Public Works, and also in the case of double line with centre poles with the exception of the strip of concrete in the centre, 3' 5" in width, which under the terms of the Ordinance they are not called upon to lay.
We trust that this explanation will be considered by your Department as in every way satisfactory, and will demonstrate fully the fact that the Company have been perfectly consistent in this matter throughout.
We would add, for the information of your Department, that since the Director of Public Works has received instructions that he is not to insist upon the 3' 5" of concrete, he has called upon the Company to discard the centre pole and adopt the side pole construction for a distance of approximately one mile along the Praya East, again throwing additional expense upon the Company owing to the fact that centre poles and fittings had been provided.
P.S. We have the honour to be, Sir, Yours faithfully, Alfred Dickinson.
We herewith return the tracing you sent to us.
: ༞ *
·
All V
718
ameleonanings até o melgen oma
cotonpederon e Shken
ft wren den bearan and doldu
In
en qU DA330 viure el A
*** era no @dney ends
j
de molderip nett te u emudaer efqete gy
of neem en fog er dette namn efabric & mene
R * ne e rimat and ba 1001 Itap
topona tiesn navle for mat he broke ed od
sme weddet end to difingu p*** Me YE
bar * ar
I frech jest um ev et cottardowo- or
SAMPER
tou h'mos
dasid tegel Tuot
ง
minas deper nd benefici com quained ada A DE
en vd Ise (39. need qrayon ovri adver abbia e 90%
Betzonen ak nerd over
*
tais
suo od boliba eg
* Vint new ent Itime 3pr
€
bidgeup Arid evca að ei
Phton alde goterm?
0
under the Ordinance and decline to concrete beyond the 18"
outside each track where the tracks were more than 4' apart.
The Director of Public Works has agreed, so far as the line
shewn in red upon the enclosed diagram No T2698 is concerned, to
the laying of the form of permanent way construction marked "A"
upon the on-losed drawing No T2699, which is the form of
construction submitted by us on the 31st ay 1902.
This does
not provide for the extra foundati on conerate which Messrs Leigh
& Orange at the instigation of the Tirentor of Public Works
added to the plan in December 1902.
In the case of double line with side poles the Company
is carrying out the requirements of the Director of Public
Works, and also in the case of double line with centre poles
with the exception of the strip of congrats in the centre, 31 5*
in width, which under the terms of the Ordinance they are not
called upon to lay.
We trust that this ex lanation will be considered by your
Department as in every way satisfactory, and will demonstrate fully the fact that the Company have been perfectly consistent
in this matter throughout.
We would add, for the information of your Department, that
since the Director of Public Works has received instructions that
he is not to insist upon the 3' 5" of concrete, he has called upon the Company to discard the centre pole and adopt the side pole construction for a distance of approximately one mile along the Praya East, again throwing additional expense upon the Company owing to the fact that centre poles and fittings had bean provided.
P.S.
We have the honour to be, Bir,
Yours faithfully,
Alfred Dichinosur
We herewith return the tracing you sent ta
us.